Asbestos Testing and Abatement for Older East Valley Homes

Planning to cut, sand or tear out materials in an older home? Test first. We sample the materials you plan to touch, and if asbestos turns up, we handle removal or encapsulation, then post-abatement clearance testing.

Request Service

Tell us what happened and we'll call you back. In a hurry? Call (623) 288-5596.

  • We answer 24/7

Or call us directly at (623) 288-5596

Asbestos

When should an Arizona home be tested for asbestos?

Before you cut, sand or tear out materials in an older home. Asbestos can hide in popcorn ceilings, older floor tiles, drywall joint compound and pipe insulation, and you can’t tell by looking. The EPA says material that isn’t damaged or disturbed is unlikely to pose a health risk, so testing matters most right before work or damage disturbs it.

  • Sampling before a remodel or tear-out
  • Popcorn ceilings
  • Older floor tile, drywall joint compound and pipe insulation
  • Emergency asbestos response
  • Residential asbestos removal
  • Commercial asbestos abatement
  • Encapsulation
  • Post-abatement clearance testing
Crew member in a protective suit, orange hard hat and respirator loading debris into a wheelbarrow
Based in GilbertEast Valley · Phoenix area

Good to know

What's the difference between removal and encapsulation?

Removal takes the asbestos-containing material out of the building. Encapsulation seals it in place so fibers aren’t released, an option when the material can safely stay where it is instead of coming out for the project. Which one fits depends on the material, its condition and the work you have planned. Either way, post-abatement clearance testing comes after.

Planning a remodel in an older house?

  1. Hold off on cutting, sanding or scraping ceilings, floors or walls until they’re tested.
  2. Leave damaged or crumbling material alone, and keep kids and pets away from it.
  3. Skip the do-it-yourself sample kit. The EPA recommends against sampling it yourself.
  4. List what the project will touch: ceilings, flooring, walls, pipe wrap.
  5. Call (623) 288-5596 to set up sampling before the work begins.
Garage fire damage with the ceiling drywall hanging down, insulation exposed and a burned SUV below
Bathroom wall with mold across the drywall, the vanity removed and the drain pipe showing
Drywall cut away from a block wall to show dark mold growth on its back side, with a utility knife on the carpet
Wide view of a burned garage with charred framing, hanging insulation and a burned vehicle

The rules

Does Maricopa County have to be notified before asbestos work?

For some projects, yes. Maricopa County Air Quality requires notice at least 10 business days before a regulated renovation or demolition, and regulated demolitions need it with or without asbestos. Regulated housing includes buildings with five or more units, complexes with more than one building, and any single-family home that has ever had a commercial, institutional or industrial use.

10 daysbusiness days of notice the county needs before regulated work

For renovations, the county notice applies when the work will remove or disturb friable asbestos above set amounts: 160 square feet, 260 linear feet of pipe, or 35 cubic feet. Maricopa County Air Quality: asbestos program. Regulated projects in Pinal County, which takes in San Tan Valley, file with that county’s agency instead, as ADEQ explains on its asbestos page. For homeowners, the EPA’s advice is plain: if you suspect a material contains asbestos, don’t touch it, and taking samples yourself is not recommended. EPA: protect your family from asbestos.

Our process

Sample first, then decide

  1. PlanWe go over which materials your project will cut, sand or tear out.
  2. SampleThe materials you plan to touch get sampled before work begins.
  3. ResultsYou learn what you're working with, and the options if asbestos turns up.
  4. Remove or encapsulateAsbestos-containing material is taken out or sealed in place.
  5. Clearance testPost-abatement clearance testing follows the removal or encapsulation.

FAQ

Asbestos Testing Questions for Older Arizona Homes

Not necessarily. Older homes are more likely to have asbestos-era materials, but not every one does, and you can’t tell by looking. The only way to know is to sample the specific materials your project will disturb, like a popcorn ceiling or an old floor tile, and get them analyzed before the work starts.

Not until it’s tested. Popcorn texture is on the short list of places asbestos can hide, and scraping is exactly the kind of disturbance that releases fibers. If the sample comes back clean, go ahead with the project. If it doesn’t, removal or encapsulation comes next, followed by clearance testing.

It’s the check after the abatement work. Once asbestos has been removed or encapsulated, clearance testing looks at the work area before the space goes back into use and your remodel moves ahead. It is the last step in the order we follow: sample first, then removal or encapsulation, then clearance testing.

Yes. The services on our Google profile include commercial asbestos abatement as well as residential removal. Commercial and multi-unit buildings are far more likely to fall under Maricopa County’s notification rule, so the schedule needs room for that notice before regulated work begins. Tell us the building type and how it’s used when you call.

The same rule applies: test before tearing out. Water and fire jobs in older homes often mean removing drywall, flooring and ceilings, the very materials asbestos testing is about. We sample what has to come out, and if asbestos turns up, removal or encapsulation and clearance testing come before the rest of the tear-out.

Service area

Where do you offer asbestos testing?

Sampling and abatement are available across our whole service area, which reaches about 50 miles out from Gilbert. That takes in Gilbert, Mesa, Tempe, Chandler, Scottsdale, Phoenix, Queen Creek and San Tan Valley, plus Paradise Valley and Fountain Hills. Call (623) 288-5596 to book.

Talk to our team

Test before you tear out

Call (623) 288-5596 and tell us what you plan to cut, sand or remove. We’ll sample those materials so you know what you’re working with before the work begins.

Call now Request Service